BREEAM Travel Plan
Contents |
[edit] Aim and benefits
To recognise the consideration given to accommodating a range of travel options for building users, thereby encouraging the reduction of reliance on forms of travel that have the highest environmental impact.
[edit] When to consider
[edit] Step by step guidance
A travel assessment / statement has been carried out to ensure the travel plan is structured to meet the needs of a particular site. The following needs to be covered:
1) Existing travel patterns and opinions of existing building or site users towards cycling and walking so that constraints and opportunities can be identified.
2) Travel patterns and transport impact of future building users.
3) Current local environment for walkers and cyclists.
5) Public transport links serving the site.
6)Current facilities for cyclists.
The travel plan should include a package of measures to encourage the use of sustainable modes of transport and movement of people and goods during the building's operation and use.
If the occupier is known, they must be involved in the development of the travel plan and they must confirm that the travel plan will be implemented post construction and be supported by the building's management in operation.
[edit] Questions to ask while seeking compliance
The Transport Consultant creating the Travel Plan should be questioned if parts of the Travel Plan are non compliant.
[edit] Tools and resources
Travel plan - Top 10 easy win issue
Travel Plan and Transport Assessment
[edit] Tips and best practice
It may be a good idea to compare the Travel Plan with previous assessments' Travel Plans to check compliance.
[edit] Typical evidence
Compliant Travel Plan and Transport Assessment
[edit] Applicable Schemes
The guidelines collated in this ISD aim to support sustainable best practice in the topic described. This issue may apply in multiple BREEAM schemes covering different stages in the life of a building, different building types and different year versions. Some content may be generic but scheme nuances should also be taken into account. Refer to the comments below and related articles to this one to understand these nuances. See this document for further guidelines.
- UK New Construction 2014
BRE Global does not endorse any of the content posted and use of the content will not guarantee the meeting of certification criteria.
Featured articles and news
The Buildings of the Malting Industry. Book review.
Conserving places with climate resilience in mind.
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.
Passivhaus social homes benefit from heat pump service
Sixteen new homes designed and built to achieve Passivhaus constructed in Dumfries & Galloway.
CABE Publishes Results of 2025 Building Control Survey
Concern over lack of understanding of how roles have changed since the introduction of the BSA 2022.
British Architectural Sculpture 1851-1951
A rich heritage of decorative and figurative sculpture. Book review.
A programme to tackle the lack of diversity.
Independent Building Control review panel
Five members of the newly established, Grenfell Tower Inquiry recommended, panel appointed.
Welsh Recharging Electrical Skills Charter progresses
ECA progressing on the ‘asks’ of the Recharging Electrical Skills Charter at the Senedd in Wales.